Permits are the part of a concrete project nobody wants to think about, and the part that causes the most headaches when it's skipped. The rules depend on where the concrete is going and which city you're in. Here's a practical guide for Dallas-area homeowners.
Note: permit rules change and every city sets its own. Always confirm with your city's building or development services department before you start. This article is general guidance, not legal advice.
The key question: public or private property?
Work in the public right-of-way
The strip between your property line and the street usually belongs to the city. That typically includes:
- The driveway approach (the section that meets the curb)
- The public sidewalk in front of your house
- Curb cuts and curb repairs
Work in the right-of-way generally requires a permit from the city in Dallas and in most surrounding cities, and has to be built to city specifications for thickness, steel, slopes and joints. Cities may also require an inspection before the pour.

A commercial walk with a curb ramp and detectable warning surface.
Work on private property
Flatwork entirely on your lot, like a backyard patio, a walkway to the front door or a driveway section that doesn't touch the approach, often doesn't need a building permit in many DFW cities. But there are common exceptions:
- Impervious cover limits. Some cities limit how much of a lot can be paved.
- Drainage. Changing how water leaves your lot, especially toward a neighbor, can trigger review.
- Easements. Pouring over a utility or drainage easement can be restricted.
- Structural work. Foundations, footings for structures, and retaining walls above a certain height generally require permits.
- Floodplain lots. Additional rules can apply.
Don't forget your HOA
Many neighborhoods in Dallas, Frisco, Plano, McKinney and across DFW have HOAs with their own approval process. Driveway widening, colored or stamped concrete in the front yard, and new walkways commonly need architectural committee approval. HOA approval and city permits are separate. You may need both.
What happens if you skip the permit?
- The city can require the work to be removed or redone to spec.
- Fines and stop-work orders are possible.
- Unpermitted work can come up when you sell the house.
- An approach built off-spec can crack or fail at the curb line.
Questions to ask your contractor
- Does this job need a permit, and who's pulling it?
- Is the permit fee included in the quote?
- Will the work be built to the city's approach and sidewalk specs?
- How does an inspection affect the schedule?
A good contractor will answer these before you sign, not after the concrete truck shows up. More in how to choose a concrete contractor in Dallas.