Replacing a driveway is a big project, but it's not complicated when you know what to expect. Here's how a typical residential driveway replacement goes with our crew, from the first phone call to the day you park on it.
Step 1: Site visit and written quote
We measure the driveway, look at how it failed, check drainage and access, and talk through options like thickness, finish and whether to widen. You get an itemized written proposal, usually the same day and always within 24 hours. Pricing for a typical two-car replacement in DFW runs $4,000–$9,000. (See driveway cost in Dallas.)
Step 2: Scheduling and permits
If the work includes the approach or public sidewalk, a city permit may be needed. (See permits in Dallas.) We'll also confirm HOA requirements and line up a pour date around the weather.
Your prep: move vehicles out and plan where to park for about a week. Let neighbors know there will be equipment and trucks.
Step 3: Demolition and haul-off
The old concrete is saw-cut at the edges so the break is clean, then broken out and hauled away. On most residential driveways this takes about a day.
Step 4: Sub-grade preparation
This is the most important step, and the one cheap bids skip. Soft or organic soil is removed, the base is graded for proper slope and drainage, then compacted. On North Texas clay, a uniform, compacted base is what keeps the new driveway from cracking like the old one. (See why Dallas clay cracks concrete.)

Sub-grade cut, graded and compacted before forms go in.
Step 5: Forms and steel
Forms are set to the final grade. Rebar is tied on a grid and lifted on chairs so it sits inside the slab, not on the ground. Where the new driveway meets the garage slab or approach, we add isolation joints or dowels as needed.
Step 6: The pour and finish
The concrete truck arrives, the slab is placed, leveled and finished. A broom finish is standard for grip, unless you've chosen a decorative finish. In summer we pour early to stay ahead of the heat. (See pouring in Texas heat.)
Step 7: Control joints and curing
Control joints are cut within hours so cracking happens in straight lines where we want it. A curing compound helps the slab hold its moisture and gain strength.

A finished broom-textured driveway with saw-cut control joints.
Step 8: Hands off while it cures
- Foot traffic: after about 24 hours
- Passenger cars: typically after about 7 days
- Heavy trucks, RVs, trailers: wait longer. We'll tell you when.
Concrete keeps getting stronger for weeks after the pour.
Step 9: Cleanup and walkthrough
Forms are pulled, edges are backfilled and the site is cleaned up. We walk the job with you so you know how to care for it.
Step 10: Long-term care
Seal it after it has cured, keep joints sealed, and skip the rock salt in winter. Our North Texas maintenance checklist covers the rest.
How long does it all take?
For a typical residential driveway, the on-site work (demo through pour) usually takes a few days, plus about a week of curing before you drive on it. Weather and permits are the biggest variables.
Ready to replace your driveway? Request your free written quote or call (817) 966-0620. See our repair & replacement and demolition services.